Back to Home
Industry / Engineering Partners

Your Overflow Team,
On Demand.

MEP firms, electrical contractors, and engineering consultants use TekMinds as a white-label extension of their own team — for drafting and design overflow, bid estimation, shop drawings, BIM coordination, technical proposals, and everything in between. You take the credit. We do the work.

MEP Engineering Firms Electrical Contractors System Integrators & Consultants White-Label & NDA-First
MEP Engineering Firms

Drafting & Design Support
That Looks Like Yours.

When your team is stretched across multiple projects and deadlines are stacking up, TekMinds steps in as a seamless extension of your firm. We produce AutoCAD and Revit deliverables on your title block, under NDA, to your standards — work product that goes out under your name without anyone knowing we were involved.

Electrical design drafting (AutoCAD / Revit MEP)
BIM coordination & clash detection (Revit / Navisworks)
Electrical load calculations & panel schedules
Lighting design & photometric analysis (AGi32 / DIALux)
Permit drawing packages & AHJ coordination support
Energy compliance documentation (ASHRAE 90.1 / Title 24)
Riser diagrams, one-lines & conduit schedules
Equipment specifications & product data sheets
Electrical Engineering
BIM & Drafting

Hospital Expansion — Full Electrical BIM Package, 280,000 SF

Full Revit MEP electrical model and coordination package for a 280,000 SF hospital expansion, including power, lighting, fire alarm, and low-voltage systems. Clash-detected against mechanical and structural models, with all permit drawings produced on the MEP firm's title block under NDA.

Revit / Navisworks NEC / ASHRAE 90.1 8 weeks
Permit Package

Commercial Office Building Electrical Permit Set — 85,000 SF

Complete electrical permit drawing set for an 85,000 SF Class A office building, including single-line diagram, panel schedules, lighting plans, emergency power system design, and load calculations — submitted for AHJ review within 10 business days of project kickoff.

AutoCAD / AGi32 NEC 2023 / IECC 10 days
Energy Compliance

ASHRAE 90.1 & Title 24 Documentation — Mixed-Use Development

Energy compliance documentation for a 6-building mixed-use development across California, including Title 24 Part 6 lighting compliance forms, ASHRAE 90.1 power density calculations, and control narrative documentation for the AHJ submittal packages.

Excel / COMcheck ASHRAE 90.1 / Title 24 2 weeks
Electrical Contractors

Bid Support That
Helps You Win.

Electrical contractors need fast, accurate takeoffs, clean shop drawings, and organized project documentation — without pulling your field supervisors off the job. TekMinds provides the back-office engineering and documentation support that keeps your bids competitive and your projects running clean.

Detailed material & labor takeoffs from plans and specs
Bid estimation & proposal formatting
Shop drawing preparation & submittal packages
As-built drawing production & redline incorporation
Project scheduling (Primavera P6 / MS Project)
RFI preparation & submittal log management
Change order documentation & cost analysis
Project closeout documentation packages
Project Support
Bid Estimation

$14M Healthcare Electrical Bid — Complete Material & Labor Takeoff

Full material and labor takeoff for a $14M electrical package on a hospital expansion, covering power distribution, lighting, fire alarm, nurse call, and low-voltage systems. Delivered 5 days before bid deadline with a formatted summary worksheet, alternates, and a bill of materials ready for vendor quoting.

Bluebeam / Excel NECA / RS Means 5 days
Shop Drawings

Shop Drawing Package — Industrial Manufacturing Facility, 320,000 SF

Complete shop drawing package for the electrical scope of a 320,000 SF industrial manufacturing facility, including conduit routing plans, panel schedules, switchgear submittals, lighting control system diagrams, and a submittal log with compliance matrix for the general contractor.

AutoCAD / Bluebeam NEC 2023 / NFPA 70 3 weeks
Project Closeout

Project Closeout Documentation — $22M Commercial Electrical Package

Complete closeout documentation package for a $22M commercial electrical project, including as-built drawings incorporating all field redlines, O&M manuals, equipment submittals, warranty documentation, and a final commissioning checklist — submitted to the owner 2 weeks ahead of the contractual deadline.

AutoCAD / Procore AIA / NEC 4 weeks
System Integrators & Consultants

Technical Depth,
Project Scale.

System integrators and engineering consultants bring us in when they need specialized technical documentation, proposal support, or additional project capacity without adding headcount. TekMinds provides controls documentation, technical writing, RFP support, and engineering analysis that slots seamlessly into your delivery model.

PLC/HMI program documentation & functional specs
SCADA architecture diagrams & integration documentation
Control panel design & UL 508A documentation (UL 508A)
Technical writing — operations manuals, design narratives
Technical proposal & RFP/RFQ response writing
FAT & SAT (site acceptance test) documentation
Network architecture & communication diagrams
Commissioning plans & validation documentation
Electrical Engineering
SCADA Documentation

SCADA Documentation Package — Water Treatment Plant Upgrade

Full SCADA documentation package for a water treatment plant automation upgrade, including network architecture diagrams, I/O lists, PLC/HMI functional spec, DNP3 point lists, alarm philosophy document, and a commissioning checklist — delivered under NDA on the integrator's document template.

AutoCAD / Visio / Word ISA-18.2 / IEC 62443 3 weeks
Technical Proposal

Federal SCADA RFP Response — Water Authority, Mid-Atlantic

Complete technical proposal for a federal SCADA system RFP covering 24 pumping stations, including technical approach narrative, system architecture overview, project schedule, qualifications matrix, past performance narratives, and a professionally formatted 58-page proposal — submitted on time for a 7-day window.

Word / InDesign / Excel FAR / AWWA Standards 7 days
Controls Design

UL 508A Control Panel Package — Pharmaceutical Manufacturing Line

Full control panel design and UL 508A documentation package for a 6-panel pharmaceutical manufacturing line, including panel layouts, wiring diagrams, component selection with UL-listed alternatives, spacing/creepage analysis, and a submittal-ready compliance binder.

AutoCAD / EPLAN / Word UL 508A / cUL / FDA 21 CFR 2 weeks

A Partner Your Clients
Will Never Know About

Engineering firms and contractors come back to TekMinds because we operate exactly like an extension of their team — on their standards, on their template, under NDA.

True White-Label

Everything is delivered on your title block, in your format, under your name. Strict NDA as standard — your clients will never know TekMinds was involved.

Elastic Capacity

Scale a 2-person drafting team up to a 10-person engineering team in days — and back down just as fast. No hiring overhead, no bench costs, no long-term commitments.

Multi-Discipline in One Place

Electrical, mechanical, structural, project, finance, and compliance — one partner covers every discipline you need to subcontract, under one NDA and one point of contact.

Fast Turnaround

Most deliverables are turned around in 5–10 business days. For urgent bid support, drawing packages, or compliance reviews, we can often deliver same-week.

Work With Us

Need an Engineering Team
Behind Your Team?

Whether it's a drafting overflow for an overloaded MEP firm, bid support for an electrical contractor, or SCADA documentation for a system integrator — TekMinds can mobilize within days, work under your brand, and deliver on your timeline.