From LV/MV switchgear documentation and power system studies through utility substation design, SCADA integration, and critical facility electrical engineering — TekMinds delivers standards-ready output for manufacturers, utilities, and data center operators who can't afford errors or delays.
Switchgear and panelboard manufacturers need accurate, submittal-ready documentation packages produced fast — often against tight shop schedules and UL witness timelines. TekMinds provides the engineering documentation, compliance review, and 3D design support your shop floor and project teams depend on.
Complete engineering drawing package for a 2500A and 3000A manual transfer switchgear order including assembly drawings, wiring diagrams, schematic diagrams, and nameplate schedule — submitted to the customer within 5 business days of order release.
Full UL 508A compliance review and documentation package for a production line of 12 custom motor control panels, including component evaluation, spacing/creepage analysis, wiring method verification, and a compiled submission-ready binder.
Full arc flash and short circuit analysis for a 480V industrial distribution system serving a manufacturing facility with 14 distribution panels and 3 motor control centers. Delivered with NFPA 70E-compliant labels, PPE category assignments, and updated single-line diagram.
Electric utilities and transmission operators need precise, standards-compliant engineering for protection systems, power system studies, and SCADA integration. TekMinds provides the technical depth to support substation design, relay settings, grid analysis, and as-built documentation at the pace your capital program demands.
Full protection and relay design package for a new 69kV/12.47kV distribution substation, including relay settings files for SEL-751 feeder protection, SEL-387 transformer differential, and SEL-421 line protection, with coordination curves and relay panel wiring diagrams.
Load flow, short circuit, and voltage stability analysis for a 138kV transmission network serving 8 substations, including N-1 contingency screening, transformer loading analysis, and a report formatted for submission to the regional transmission organization.
SCADA communication architecture and integration documentation for a distribution automation upgrade across 12 substations, including DNP3 point lists, RTU/IED interface specifications, communication network diagrams, and a master station data model document.
Data centers and critical facilities demand electrical design with zero margin for error — from MV distribution and generator integration through UPS systems, automatic transfer switching, and power system studies. TekMinds provides the engineering documentation and analysis that keeps critical loads online and capital projects on schedule.
Full electrical design package for a 10 MW Tier III colocation data center including MV switchgear SLD, UPS system integration diagrams, generator paralleling scheme, ATS control sequences, panel schedules, and a complete power path documentation matrix for all critical loads.
Generator integration and automatic transfer switch design for a 3-generator, 6 MW standby power system on a hyperscale campus expansion, including generator paralleling panel design, load shedding control scheme, fuel system interface diagrams, and startup/transfer sequence documentation.
Arc flash and short circuit analysis for a financial services data center with dual-path 480V distribution, covering 22 distribution panels, 4 PDUs, and a 2 MW UPS system. Delivered with NFPA 70E-compliant labels, PPE schedules, and a board-ready executive summary.
Power and utility engineering demands precision. Manufacturing schedules don't slip. Utility capital programs don't wait. Here's how TekMinds delivers.
Every deliverable is produced to NEC, UL, NEMA, IEEE, and NERC requirements as applicable — no standards-chasing after the fact.
Deep experience with LV/MV switchgear and panelboard documentation means we know what the shop floor, the field team, and the AHJ all need to see.
We're calibrated to manufacturing release timelines. Most drawing packages are turned around in 3–7 business days from data receipt.
All documentation is delivered in your format, on your title block, under NDA — work product that looks and functions as if it came from your own team.
Whether it's a switchgear drawing package due Friday, a protection study for a new substation, or ongoing electrical engineering support for a critical facility expansion — TekMinds can mobilize within days.